Description
“Monicor-UKK-NO” corrosion control device is intended for installation and exposition of samples on the inner surface of a buried pipeline along its lower generatrix in order to detect the grooving corrosion and make an assessment of the working media corrosivity. Among the advantages of the Device is the fact that it is totally above-ground operated and samples are installed flush with the pipeline’s lower generatrix on the fly without stopping transit.
|
||||||||||||||||||
Being installed with “Monicor-UKK-NO”, samples allow to estimate also the effectiveness of pipe pigging.
|
||||||||||||||||||
Samples are installed on the fly with the help of a special grip through a gate valve or a stationary ball valve with a flanged joint (nominal diameter = 50 mm, nominal pressure = 40 kg/sq.cm). A part of the Device that is left in the pipe after dismantling is called a Corrosion control unit of a Monicor-UKK-NO system and can be ordered additionally.
|
||||||||||||||||||
This model was put in production at the end of 2005 and tested in 2006 at the PJSC “Yuganskneftegaz” and “Samaraneftegaz” fields.
|
||||||||||||||||||
The order of perforation and subsequent installation of a sample on a lower generatrix is represented on the diagram:
“Monicor-UKK-NO” Corrosion control unit operational diagram
|